Keep the big machines running.
Plan preventive maintenance, control spare parts and capture every weighbridge ticket for steel, cement, shipbuilding and heavy engineering operations.
Kiln drive
EQ-KLN-01
Rolling mill
EQ-RML-03
Overhead crane
EQ-CRN-07
- schedules per asset
- PM
- linked to equipment
- Spares
- tickets recorded
- Weighbridge
What the ERP keeps together
Built for heavy assets and heavy loads
Equipment register
Keep every asset with its location, specifications and history.
Preventive maintenance
Schedule PM by calendar or running hours and get work orders on time.
Critical spares
Link spare parts to equipment and keep minimum stock for critical items.
Weighbridge integration
Record gross, tare and net weight for raw material and finished goods.
How the work moves
From breakdown risk to planned maintenance
- 1
Register the asset
Add equipment with its maintenance plan and spare parts list.
- 2
Plan the PM
Work orders are created from calendar or hour-based schedules.
- 3
Do the job
Technicians issue spares, record work and close the order.
- 4
Learn from downtime
Review breakdowns and adjust plans to prevent repeats.
| Work order | Equipment | Type | Status |
|---|---|---|---|
| WO-2611-118 | Kiln drive EQ-KLN-01 | Preventive | Scheduled |
| WO-2611-119 | Rolling mill EQ-RML-03 | Breakdown | In progress |
| WO-2611-120 | Overhead crane EQ-CRN-07 | Inspection | Completed |
| WO-2611-121 | Clinker cooler EQ-CLC-02 | Preventive | Awaiting spares |
Fictional equipment and work orders, for illustration only.
Connected product pages
Open the product pages behind this workflow
Good to know
Questions teams ask
Other group sectors
Can PM be based on running hours?
Yes. Schedules can follow calendar intervals, running hours or both.
Can we connect our weighbridge?
Weighbridge tickets can be recorded in AdonERP; device integration is scoped during implementation.
Is this equipment real?
No. Equipment and work orders on this page are fictional.
Let's talk it through
Bring your maintenance plan to a demo
We will show how assets, PM and spares connect in AdonERP.