Spare parts: the right part on the shelf before the machine needs it

Each spare has a minimum, a maximum and the machines it fits. When stock drops below the minimum it is flagged and a purchase requisition can be raised, before a breakdown finds the shelf empty.

See the spares list

Now onboarding companies in Dhaka.

AdonERP
Nodi Polymer Industries

Engineering Maintenance

Spare Parts

Spares for the moulding and printing halls

2 below minimum
  • Pump seal kit SK-250Used on IM-01, IM-041 / 6Reorder
  • Heater band 220 VUsed on IM-01, IM-0414 / 24
  • Doctor blade 1,300 mmUsed on PP-023 / 12Reorder
  • Air filter element AF-90Used on AC-016 / 8
  • Granulator knife setUsed on GR-032 / 3
  • Proximity sensor M18Used on All moulders9 / 15

Bar: stock on hand against the maximum. Line: the minimum. Shaded: the safe range.

A partial preview of Spare Parts in Adon ERP. Company, people and figures are sample data.

A spare part, in three limits

How few, how many, and when to order.

  1. Minimum

    Never below this

    For critical spares, the number that covers the time to buy more.

  2. Reorder

    Order at this point

    A requisition is suggested when stock reaches the reorder point.

  3. Maximum

    Never above this

    So money is not tied up in parts that sit for years.

What you fill in for a spare

Part and code
From the maker's list.
Used on
The machines it fits.
Min, reorder, max
The three limits.
Lead time
How long it takes to buy.
Critical
Whether a stock-out stops a line.

Spares link the stores to the machines

Received like any item, issued to a work order, reordered through purchasing.

Spares the way factories here have to keep them

Many parts are imported, lead times are weeks, and one missing seal can stop a line.

  • Lead times counted

    Minimums set by how long imports take.

  • Critical spares

    Watched more closely than the rest.

  • Where used

    So the right part is ordered.

  • Value held

    What sits in the engineering store.

One seal kit, ordered before it ran out

A sample reorder, the way it usually runs.

  1. A seal kit is issued to the IM-04 job.

  2. Stock drops to 1, below the minimum of 2.

  3. A requisition for 4 kits is suggested.

  4. Purchasing raises the order.

  5. Kits are received; stock is back to 5.

How different trades use spare parts

Questions we get about spare parts

Are spares separate from other stock?

They are stock items with maintenance details added.

Is reordering automatic?

A requisition is suggested; someone approves it.

Can I see where a part is used?

Yes, by machine.

Are spares valued?

Yes, in the inventory summary.

What is a critical spare?

One whose stock-out stops a line.

Where is Adon ERP available?

We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.

Bring your engineering store list. We will set the limits in the demo.

A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.

Explore Engineering Maintenance