Engineering Maintenance Equipment
Equipment: every machine, where it is, and what it has cost to keep running
Machines sit in a tree: plant, hall, line, machine. Each one has its make, serial, warranty and running hours, a QR label for the shop floor, and every job ever done on it.
Now onboarding companies in Dhaka.
- 01
Every machine in a tree: plant, hall, line and machine
- 02
Make, model, serial, installation date and warranty
- 03
Running hours or counters for meter-based maintenance
- 04
Criticality, so the right machines are looked after first
Engineering Maintenance
Equipment
Plant tree
- Gazipur plant
- Moulding hall
- Injection moulderIM-01
- Injection moulderIM-04
- GranulatorGR-03
- Printing hall
- Printing pressPP-02
- Utilities
- Air compressorAC-01
Injection moulder IM-04
Gazipur plant / Moulding hall
- Make & model
- Haitian MA 2500
- Serial
- HT-25-•••4471
- Installed
- 12 Mar 2019
- Cost
- BDT 1,48,00,000
- Warranty
- Ended Mar 2021
- Running hours
- 21,480 h
Open jobs
2
Next PM
6 Nov
Cost this year
BDT 3,84,500
A machine record, in three layers
Where it sits, what it is, and what has happened to it.
- 1Place
In the plant tree
Plant, hall, line and machine, so cost and downtime add up at every level.
- 2Facts
What it is
Make, model, serial, installation date, warranty and the meter you read.
- 3History
What it has needed
Every work order, part and hour, from the day it was installed.
What you fill in for a machine
- Name and code
- Such as Injection moulder IM-04.
- Location
- Its place in the plant tree.
- Make, model, serial
- From the nameplate.
- Criticality
- A, B or C, by what a stop costs.
- Meter
- Running hours or a counter, if used.
Equipment is what everything else in maintenance is about
Plans, jobs, parts and downtime all point at a machine.
Linked to
- Fixed Asset Register
Cost and depreciation.
Used by
- PM Schedules
Plans for each machine.
- Work Orders
Jobs on each machine.
- Spare Parts
Parts it uses.
Machine records the way factories here need them
Machines are often imported, manuals are in another language, and knowledge sits with one or two people.
History stays
Even when a technician leaves.
QR on the machine
Scan to report a fault.
Linked to the asset register
One machine, one record.
Criticality first
A-class machines served first.
One new machine, from crate to record
A sample installation, the way it usually runs.
The machine is received and added to fixed assets.
It is placed in the tree under Moulding hall.
Make, serial and warranty are filled in.
A monthly PM plan is attached.
A QR label is printed and stuck on it.
Questions we get about equipment
How deep can the tree go?
As many levels as you need.
Is it the same as the fixed asset register?
Linked to it; maintenance details live here.
Can I attach manuals?
Yes, files and photos.
What is criticality for?
To decide which jobs come first.
Can I print QR labels?
Yes, from the machine record.
Where is Adon ERP available?
We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.
How different trades use the equipment register
- Retail
Fridges, lifts and generators by store.
- Food & Hospitality
Ovens, fryers and cold rooms by outlet.
- Real Estate
Lifts and pumps by building.
- Consulting
Laptops, vehicles and printers.
- Manufacturing
Every machine on every line.
- Health & Fitness
Medical devices by department.
- Trades
Vehicles and tools by crew.
- Others
Generators by site.
Bring your machine list. We will build the plant tree in the demo.
A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.