Engineering Maintenance Work Orders
Work orders: every job on a machine, with what it took to fix
A breakdown is reported, a technician takes it, parts come from stores and the checklist is ticked off. When it closes, the hours, the parts and the downtime are all on the job.
Now onboarding companies in Dhaka.
- Breakdown, preventive and improvement work orders
- A checklist, the technician and the hours on each job
- Spare parts issued against the work order
- Downtime from the first report to the machine running again
Engineering Maintenance / Work Orders
Work Orders
Open
5
In progress
6
Waiting for parts
3
Done this month
41
WO-2026-0418 · Breakdown
Hydraulic oil leak at main pump
Injection moulder IM-04 · reported 2 Nov 07:40 by the shift supervisor
Checklist · 3/5
- Isolate power and lock out
- Drain hydraulic oil
- Replace main pump seal kit
- Refill and bleed the system
- Test run 30 minutes at full pressure
Parts used
- Pump seal kit SK-2501 · 18,400
- Hydraulic oil ISO VG 4660 L · 21,000
- Labour
- 5.5 h · 2,750
- Job cost
- BDT 42,150
A work order, in three stages
Report, repair, close. Each stage leaves something on the record.
01 · Report
Something is wrong
From the floor, by phone or by QR scan, with the machine and what was seen.
02 · Repair
A technician works on it
Tasks ticked off, parts issued from stores, hours booked.
03 · Close
Running again
The cause is recorded, downtime ends, and cost is booked to the machine.
What a work order holds
- Machine and type
- Breakdown, preventive or improvement.
- Priority
- From the machine's criticality.
- Technician
- Who is doing it.
- Tasks and parts
- Checklist and stores issues.
- Cause
- Why it failed, for the downtime Pareto.
Work orders are where maintenance actually happens
They take parts out of stores and put hours into the downtime log.
Raised from
- Equipment
The machine being fixed.
- PM Schedules
Planned jobs.
Takes from and writes to
- Spare Parts
Parts issued to the job.
- Downtime
Hours the machine was down.
Where it shows up
- Overview
Open jobs and MTTR.
- Journal Entries
Maintenance cost posted.
Work orders the way engineering teams here work
Breakdowns at night, a technician on each shift, and parts that may need to be bought.
Reported from the floor
By the operator, on a phone.
Handed over by shift
Open jobs carry to the next team.
Waiting for parts
Kept apart, so delays are visible.
Cost on the machine
Parts and hours add up per job.
One breakdown, from leak to running
A sample job, the way it usually runs.
The supervisor reports an oil leak on IM-04.
Kamal takes the job and isolates the machine.
A seal kit and oil are issued from stores.
The seal is replaced and the system refilled.
Test run passes; the job closes at 5 h 30 m.
How different trades use work orders
- Retail
Store repairs by branch.
- Food & Hospitality
Kitchen breakdowns before service.
- Real Estate
Tenant complaints by building.
- Consulting
Office repairs and IT jobs.
- Manufacturing
Breakdowns on every line.
- Health & Fitness
Device repairs by ward.
- Trades
Customer jobs by crew.
- Others
Site repairs by region.
Questions we get about work orders
Can operators report faults?
Yes, from a phone or by scanning the machine's QR.
Are parts taken from stock?
Yes, issued to the job from stores.
Is downtime recorded?
Yes, from report to close.
Can a job wait for parts?
Yes, it shows as waiting until parts arrive.
Is the cost posted?
Yes, parts and labour to the accounts.
Where is Adon ERP available?
We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.
Bring last week's job cards. We will enter them as work orders in the demo.
A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.