Adon ERP / APPAREL ACCESSORIES
Small parts.
A much clearer order picture.
Bring buttons, zips, labels and packing detail into the order conversation, with a clear view of the quantities behind each requirement.
THE WORKFLOW, IN CONTEXT
The details deserve their own context.
Keep the item and its unit explicit.
The local example uses whole-piece accessories only. Use the product conversation to explore your own item identities and units.
- 01Accessory identity
- 02Per-garment count
- 03Explicit unit
EXPLORE A SMALL PART OF THE WORK
Explore a small trims requirement.
Change an illustrative order quantity, per-piece counts, stock and extra allowance. Every item is counted in pieces; no purchase or stock reservation is created.
| Example item | Pieces / garment | Example stock · pcs | Required · pcs | Short · pcs | Spare · pcs |
|---|---|---|---|---|---|
| Buttons | 6,150 | 150 | 0 | ||
| Zips | 1,025 | 25 | 0 | ||
| Labels | 2,050 | 550 | 0 | ||
| Hang tags | 1,025 | 225 | 0 |
Required pieces = order quantity × entered count × entered allowance factor, rounded up to a whole piece. The allowance is an assumption, not a standard; no purchasing or stock action is performed.
THE SUPPORTING PRODUCT CONVERSATION
Follow the relevant product detail.
Explore existing ERP presentations, then discuss your own order, material and commercial process with an advisor.
Items & products
Explore item identity and the existing product-record presentation.
Explore the presentation02 / PRODUCT PREVIEWBill of materials
Look at the manufacturing BOM and its input structure.
Explore the presentation03 / PRODUCT PREVIEWStock movements
Explore the receiving and issue record presentation.
Explore the presentation04 / PRODUCT PREVIEWQuality context
Inspect the quality workspace for an accessory-check conversation.
Explore the presentationSEE THE RECORD AND THE CONTEXT
A closer look at the experience.
Illustrative records with the complete product context available in a guided advisor conversation.
Explore a small trims requirement.
- Example order pieces
- 1,000
- Entered extra allowance
- 2.5%
- Example accessory lines
- 4
| Example item | Count / garment | Example stock · pcs | Required · pcs | Short · pcs |
|---|---|---|---|---|
| Buttons | 6 | 6,000 | 6,150 | 150 |
| Zips | 1 | 1,000 | 1,025 | 25 |
| Labels | 2 | 1,500 | 2,050 | 550 |
| Hang tags | 1 | 800 | 1,025 | 225 |
Static concept canvas, separate from the editable example above. All figures and dates are illustrative. No order, reservation, purchase request, invoice or TNA milestone is created.
Accessories workflow · Full walkthrough
See the complete workflow.
Explore your garment, material, factory and order-follow-up questions with an advisor in a guided product conversation.
A FEW USEFUL DETAILS
Understand the example.
Is the extra allowance a recommended wastage rate?
No. It is an editable assumption for this local example, rounded to 0.01 percentage point. The page assumes no standard allowance or industry loss rate.
Why are requirements rounded up?
All four example items use whole pieces. The calculator rounds each entered requirement up to the next whole piece after the allowance; it does not convert between pieces, metres or other units.
Does a shortfall generate a purchase request?
No. The example does not read live stock, reserve items or create a purchase document. Bring your actual items and units to the advisor demo.
YOUR OPERATION. YOUR WORKFLOW.
Bring your order’s story to the conversation.
Discuss your style, factory, material and commercial-record questions with an advisor.