Production foundation
Every input accounted for.
Every output defined.
Build a clear production recipe for materials, quantities and expected outputs. Include co-products, by-products and scrap so the production model reflects the real process.
1,000 kg
Plain colour sheet · 98% yield
BOM-CTL-PLAINBill of Materials · In focus
Production recipes, down to the material line.
Explore the supplied steel-product BOM register and the plain-sheet recipe, including input, scrap, yield and estimated cost.
A closer look at the real workflow.
Bill of Materials
Software data preview| BOM | Product | Type | Output | Yield | Lines |
|---|---|---|---|---|---|
| BOM-CTL-PLAINDefault | Alif Plain Colour Sheet 0.40 mm CNG GreenPS-040-GRN | Standard | 1,000 kg | 98% | 2 |
| BOM-CORR-CDDefault | Alif Colour Sheet — Cherry Dew profile 0.25 mm Alif BlueCS-CD-025-BLU | Standard | 1,000 kg | 98% | 2 |
| BOM-CORR-BDDefault | Alif Colour Sheet — Boro Dew profile 0.30 mm CNG GreenCS-BD-030-GRN | Standard | 1,000 kg | 98% | 2 |
| BOM-CCL-032-GIDefault | Alif Colour Coil 0.32 mm — CNG Green (on GI Z120)CC-032-GI-GRN | Standard | 1,000 kg | 98% | 6 |
| BOM-CCL-032-BLUDefault | Alif Colour Coil 0.32 mm — Alif Blue (on AZ100)CC-032-BLU | Standard | 1,000 kg | 98% | 6 |
| BOM-CCL-025-BLUDefault | Alif Colour Coil 0.25 mm — Alif Blue (on AZ100)CC-025-BLU | Standard | 1,000 kg | 98% | 6 |
| BOM-CCL-040-GRNDefault | Alif Colour Coil 0.40 mm — CNG Green (on in-house AZ150)CC-040-GRN | Standard | 1,000 kg | 98% | 6 |
| BOM-CCL-030-GRNDefault | Alif Colour Coil 0.30 mm — CNG Green (on in-house AZ150)CC-030-GRN | Standard | 1,000 kg | 98% | 6 |
| BOM-CGL-040Default | Alif Galvalume coil AZ150 0.40 mm × 1219 mmSF-GL-040 | Standard | 1,000 kg | 98% | 3 |
| BOM-CGL-030Default | Alif Galvalume coil AZ150 0.30 mm × 1000 mmSF-GL-030 | Standard | 1,000 kg | 98% | 3 |
Bill of Materials · Full walkthrough
See the complete workflow.
Book a guided demo to explore the full workspace, records and production process.
A clear way to work
From first step to follow-through.
A practical sequence for bill of materials, with the production context kept together.
- 01
Define the output
Choose the finished product, BOM type and batch quantity.
- 02
Build the inputs
Add material quantities with the correct units of measure.
- 03
Account for yield
Identify co-products, by-products, process loss and scrap.
- 04
Use the recipe
Link the approved BOM to planning and production orders.
Built to work together
Keep the production context.
Follow the related parts of Manufacturing that give this work its inputs, operating context and next step.
Requirements from recipes
Use product demand and BOM quantities to calculate material needs.
Explore moduleA consistent order starting point
Production orders use the recipe as their material basis.
Explore moduleJoint output, clear cost shares
Keep expected outputs connected to standard cost assumptions.
Explore moduleSee your production in context
Take a closer look at bill of materials.
Walk through the workflow with your production team and explore how it fits your operation.