Create and confirm
Select product, quantity, BOM, and Routing; reserve components.
Manufacturing · Production control
A Production Order turns a BOM and Routing into an executable job, reserving components, sequencing operations, and recording every output.
Alif Colour Coil 0.32 mm — Alif Blue (on AZ100)
In progressYour production, in focus
Preview steel production orders with their product, BOM, planned quantity, recorded output and current status.
| MO # | Product | BOM | Status | Planned | Produced | Start |
|---|---|---|---|---|---|---|
| MO-2026-000058 | Alif Colour Coil 0.32 mm — Alif Blue (on AZ100)CC-032-BLU | BOM-CCL-032-BLU | In progress | 32,000 | 0 | — |
| MO-2026-000057 | Alif Plain Colour Sheet 0.40 mm CNG GreenPS-040-GRN | BOM-CTL-PLAIN | Completed | 29,773.26 | 29,773.26 | — |
| MO-2026-000056 | Alif Colour Sheet — Cherry Dew profile 0.25 mm Alif BlueCS-CD-025-BLU | BOM-CORR-CD | Completed | 32,117.58 | 32,117.58 | — |
| MO-2026-000055 | Alif Colour Sheet — Boro Dew profile 0.30 mm CNG GreenCS-BD-030-GRN | BOM-CORR-BD | Completed | 40,501.89 | 40,501.89 | — |
| MO-2026-000054 | Alif Colour Coil 0.32 mm — Alif Blue (on AZ100)CC-032-BLU | BOM-CCL-032-BLU | Completed | 59,992.1 | 59,992.1 | — |
| MO-2026-000053 | Alif Colour Coil 0.25 mm — Alif Blue (on AZ100)CC-025-BLU | BOM-CCL-025-BLU | Completed | 57,922.68 | 57,922.68 | — |
| MO-2026-000052 | Alif Colour Coil 0.40 mm — CNG Green (on in-house AZ150)CC-040-GRN | BOM-CCL-040-GRN | Completed | 56,467.97 | 56,467.97 | — |
| MO-2026-000051 | Alif Colour Coil 0.30 mm — CNG Green (on in-house AZ150)CC-030-GRN | BOM-CCL-030-GRN | Completed | 59,435.02 | 59,435.02 | — |
| MO-2026-000050 | Alif Galvalume coil AZ150 0.40 mm × 1219 mmSF-GL-040 | BOM-CGL-040 | Completed | 53,308.13 | 53,308.13 | — |
The nine fully visible source rows are reproduced here. Remaining source orders are not inferred.
Production Orders · Full walkthrough
Book a guided demo to explore the full workspace, records and production process.
A consistent way to work
A Production Order connects planning, shop floor execution, quality, and cost.
Select product, quantity, BOM, and Routing; reserve components.
Run and validate each Routing step at its Work Center.
Post the main product, co-products, by-products, and scrap.
Complete the order and compare actual cost with standard cost.
Built to work together
Keep the context of every job as it moves between material planning, quality, external processing and the shop floor.
Requirements and operation sequence come from linked records.
Required inspections appear directly in shop floor execution.
External processing remains visible on the same timeline.
See every active order, Work Center, and completion level.
Bring clarity to your shop floor
Confirm an order and let materials, operations, and outputs update automatically.