Colour coating resources8 work centers in the register
CCL-PREPRE-TREATCCL-PRIMEPRIMER & OVENCCL-FINFINISHCCL-EXITINSPECT & RECOILMATERIAL HANDOFF CORRIDOR
Illustrated resource grouping using the supplied work-center records.

Production foundation

Give every operation
the right place to run.

Bring machines, teams and external resources into one production model. Define working hours, practical capacity and rates before the first job reaches the floor.

Explore the workspace
MachinesTeamsExternal resources

Work Centers · In focus

The resources behind your production.

Colour coating, galvalume, corrugation and cut-to-length work centers from the supplied software records.

AdonERPManufacturingWork Centers
Alif Steel Mills Ltd

Work Centers

Software data preview
Work centers
8
Machine resources
7
Labor groups
1
8 of 8 supplied records
Work centers from the supplied software screenshot
NameCodeTypeCapacityEfficiencyOps
Colour Coating Line — entry, cleaning & pre-treatmentWC-CCL-PREMachine——1
Colour Coating Line — exit, inspection & recoilWC-CCL-EXITMachine——1
Colour Coating Line — finish & back coater & ovenWC-CCL-FINMachine——1
Colour Coating Line — primer coater & ovenWC-CCL-PRIMEMachine——1
Continuous Galvalume Line (CGL) — furnace & Al–Zn potWC-CGLMachine——3
Corrugation — Boro Dew roll formerWC-CORR-BDMachine——1
Corrugation — Cherry Dew roll formerWC-CORR-CDMachine——0
Cut-to-length, stacking & bundlingWC-CTLLabor Group——1
Static demo excerpt recreated from the supplied software screenshots. Preview controls do not change ERP records.

Work Centers · Full walkthrough

See the complete workflow.

Book a guided demo to explore the full workspace, records and production process.

A clear way to work

From first step to follow-through.

A practical sequence for work centers, with the production context kept together.

  1. 01

    Define the resource

    Choose a machine, labor group, line or external work center.

  2. 02

    Set its calendar

    Record shifts, working hours and expected downtime.

  3. 03

    Assign capacity & rates

    Set practical capacity and the rates used in production costing.

  4. 04

    Connect operations

    Reuse the resource in routings and review its planned load.

See your production in context

Take a closer look at work centers.

Walk through the workflow with your production team and explore how it fits your operation.