Material & production planning

Make room for demand. Before you promise it.

Compare planned work with practical resource capacity. Make overloaded periods visible and review the work-center choices behind each production commitment.

Supplied weekly capacity snapshot

0%RECORDED UTILIZATIONAvailableOverloaded
Zero overloads in the supplied view. Undated work is not placed.
Explore the workspace

Capacity Planning · In focus

Capacity and load, with the exceptions in view.

The supplied eight-work-center view includes weekly buckets, one undated production order and recorded capacity overrides.

AdonERPManufacturingCapacity Planning
Alif Steel Mills Ltd

Capacity Planning

Software data preview
Work centers
8
Overloaded
0
Undated MOs
1
Planning horizon
Weekly · 8 buckets

1 production order has no planned date. Its load is not placed in the weekly view.

Eight work centers across W45 to W52 in the supplied capacity snapshot
Work centerW45W46W47W48W49W50W51W52Utilization
Colour Coating Line — entry, cleaning & pre-treatment········0%
Colour Coating Line — exit, inspection & recoil········0%
Colour Coating Line — finish & back coater & oven········0%
Colour Coating Line — primer coater & oven········0%
Continuous Galvalume Line (CGL) — furnace & Al–Zn pot········0%
Corrugation — Boro Dew roll former········0%
Corrugation — Cherry Dew roll former········0%
Cut-to-length, stacking & bundling········0%

Capacity overrides (28)

Visible capacity override examples from the supplied screenshot
Work centerDateCapacity override
WC-CCL-FINSep 4, 20261,372 min
WC-CCL-EXITSep 7, 2026408 min
WC-CORR-BDSep 7, 2026530 min
WC-CCL-PRESep 9, 2026435 min
WC-CCL-PRESep 10, 2026402 min
WC-CCL-PRESep 12, 2026412 min
WC-CCL-FINSep 16, 2026491 min
WC-CCL-FINSep 18, 2026375 min

Eight visible override examples are included from the screenshot; the source view reports 28.

Static demo excerpt recreated from the supplied software screenshots. Preview controls do not change ERP records.

Capacity Planning · Full walkthrough

See the complete workflow.

Book a guided demo to explore the full workspace, records and production process.

A clear way to work

From first step to follow-through.

A practical sequence for capacity planning, with the production context kept together.

  1. 01

    Start with the load

    Collect planned operation hours by work center and period.

  2. 02

    Apply the calendar

    Compare work with practical shifts and working time.

  3. 03

    Find constraints

    Identify overloaded resources and unavailable periods.

  4. 04

    Balance the plan

    Review alternate resources, timing and capacity assumptions.

See your production in context

Take a closer look at capacity planning.

Walk through the workflow with your production team and explore how it fits your operation.