Adon ERP / MERCHANDISING OPERATIONS
A style in motion.
A clearer next action.
Explore style development, material readiness and the time-and-action conversation, with the next handoff kept in view.
in the conversation.A date is one part of the order’s context.
THE WORKFLOW, IN CONTEXT
Keep the style’s decisions connected.
Start with the specification and commercial context.
Explore the existing style-and-costing presentation before following the material and milestone conversations.
- 01Style identity
- 02Sample context
- 03Cost-sheet presentation
EXPLORE A SMALL PART OF THE WORK
Work back from an example cutting date.
Choose a fictional planned cutting date and calendar-day offsets for four milestones. These are local planning assumptions, not production lead-time standards or a saved TNA plan.
Offsets are whole calendar days from 0 to 365. Weekends, holidays, capacity and dependencies are not modelled; the offsets are not recommended lead times.
A date conversation with the assumptions visible.
- 01Cost-sheet discussion21 calendar days before PCD24 Nov 2026
- 02Fabric-booking discussion14 calendar days before PCD01 Dec 2026
- 03Sample-review discussion10 calendar days before PCD05 Dec 2026
- 04Trim-readiness discussion7 calendar days before PCD08 Dec 2026
These dates update only this example. No TNA milestone, booking or production plan is saved.
THE SUPPORTING PRODUCT CONVERSATION
Follow the relevant product detail.
Explore existing ERP presentations, then discuss your own order, material and commercial process with an advisor.
Styles & costing
Explore the existing style, sample and costing presentation.
Explore the presentation02 / PRODUCT PREVIEWTime & action
Look at the existing TNA calendar and source milestone excerpt.
Explore the presentation03 / PRODUCT PREVIEWMaterial booking
Inspect material-line readiness in the existing workspace.
Explore the presentation04 / PRODUCT PREVIEWMerchandising overview
Explore the wider source dashboard and follow-up context.
Explore the presentationSEE THE RECORD AND THE CONTEXT
A closer look at the experience.
Illustrative records with the complete product context available in a guided advisor conversation.
Work back from an example cutting date.
- Example cutting date
- 15 Dec 2026
- Example milestones
- 4
- Calendar basis
- Calendar days
| Example milestone | Days before PCD | Calculated date | Record context |
|---|---|---|---|
| Cost-sheet discussion | 21 | 24 Nov 2026 | Local assumption · not a saved TNA plan |
| Fabric-booking discussion | 14 | 01 Dec 2026 | Local assumption · not a saved TNA plan |
| Sample-review discussion | 10 | 05 Dec 2026 | Local assumption · not a saved TNA plan |
| Trim-readiness discussion | 7 | 08 Dec 2026 | Local assumption · not a saved TNA plan |
Static concept canvas, separate from the editable example above. All figures and dates are illustrative. No order, reservation, purchase request, invoice or TNA milestone is created.
Merchandising workflow · Full walkthrough
See the complete workflow.
Explore your garment, material, factory and order-follow-up questions with an advisor in a guided product conversation.
A FEW USEFUL DETAILS
Understand the example.
Are the day offsets standard production lead times?
No. Each offset is an editable example assumption. The calculation subtracts calendar days; it does not model working weeks, holidays, capacity or supplier commitments.
Does changing a date update a production plan?
No. The example stores no TNA milestones, bookings or orders. The separate linked TNA presentation contains its own clearly labelled source and local examples.
Can we use our own style and milestone process in a demo?
Yes. Bring style-development stages, sample rounds, material requirements and planning rules to an advisor walkthrough.
YOUR OPERATION. YOUR WORKFLOW.
Bring your order’s story to the conversation.
Discuss your style, factory, material and commercial-record questions with an advisor.