Engineering Maintenance Calibration

Calibration: every instrument checked on time, with proof

Gauges, scales, thermocouples and wrenches each have an interval. Due and overdue ones are flagged, readings are recorded against the tolerance, and the certificate is attached.

See the instruments

Now onboarding companies in Dhaka.

AdonERP
Nodi Polymer Industries

Engineering Maintenance / Calibration

Calibration

Instruments

  • Pressure gauge 0–250 barPG-11Due soon
  • Digital caliper 150 mmDC-04In date
  • Thermocouple type KTC-07Overdue
  • Weighing scale 60 kgWS-02In date
  • Torque wrench 20–100 NmTW-01In date

Last calibration · PG-11

Pass
050100150200250

CertificateCAL-26-0912

A partial preview of Calibration in Adon ERP. Company, people and figures are sample data.

Calibration, in three steps

Know what is due, check it against a reference, keep the proof.

  1. 01
    Due

    Know what is coming

    Each instrument's interval sets its next date; overdue ones are flagged.

  2. 02
    Check

    Against a reference

    Readings at several points, compared with the tolerance.

  3. 03
    Keep

    Attach the proof

    The lab's certificate is attached, and failed instruments are taken out of use.

What you fill in for an instrument

01
Name and code
Such as Pressure gauge PG-11.
02
Range and tolerance
What it measures and how close it must be.
03
Interval
Days, months or a year.
04
Done by
In-house or an outside lab.

Calibration keeps measurements trustworthy

Instruments are equipment too, with their own plans and jobs.

Part of

Raises

Where it shows up

Calibration the way audits here ask for it

Buyers' audits and certification bodies ask to see that instruments are in date. It should take a minute.

  • Ready for audits

    Every certificate on file.

  • Nothing overdue unseen

    Flagged before an auditor finds it.

  • Out of tolerance

    Taken out of use with a reason.

  • Outside labs

    Sent and returned, tracked.

One gauge, calibrated before an audit

A sample calibration, the way it usually runs.

  1. PG-11 shows due in 2 days.

  2. It is sent to the lab with a work order.

  3. It returns with readings and a certificate.

  4. All points are within ±1.25 bar.

  5. The next date is set for May.

Questions we get about calibration

Can I attach the lab's certificate?

Yes, to each calibration.

What happens if an instrument fails?

It is marked out of use until fixed.

Can I record readings?

Yes, at as many points as you need.

Is calibration a work order?

Yes, raised when it falls due.

Can I see what is due this month?

Yes, on the list and the overview.

Where is Adon ERP available?

We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.

How different trades use calibration

Bring your instrument list. We will set up the intervals in the demo.

A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.

Explore Engineering Maintenance