Example formula: Lemon dishwash liquid

HC-F-021 · v3
  • Water (process)62%
  • Surfactant blend18%
  • Builders & salts12%
  • Fragrance, colour, others8%

Batch size

5,000 L

Recorded yield

4,910 L

FMCG · Home & Household Care

Cleaner formulas, clearer costs.

Plan chemical formulations, track batch yield and scrap, and know the real cost of every litre or kilo you produce.

costed per batch
Formula
planned vs actual
Yield
recorded with reasons
Scrap

What the ERP keeps together

Formulation, cost and waste under one roof

Formulation as BOM

Keep each detergent, cleaner or air-care formula as a versioned bill of materials with exact percentages.

Liquid and powder units

Work in litres, kilos and packs, with conversions handled on the record.

Scrap and rework

Record off-spec material and rework so losses are visible, not hidden in stock.

Chemical procurement

Raise requisitions for surfactants, salts and packaging and compare supplier quotes.

How the work moves

From mixing tank to market

  1. 1

    Plan the batch

    Choose the formula version and batch size; material needs are calculated.

  2. 2

    Mix and test

    Issue materials, record the mix and capture QC readings.

  3. 3

    Fill and pack

    Convert bulk into bottles, pouches or sachets and close the order.

  4. 4

    Cost the output

    See material, labour and overhead cost per unit for the finished batch.

Batch yield and costIllustrative · fictional records
BatchProductYieldCost per unit
HC-2611-031Dishwash liquid 500 ml98.2%৳41.60
HC-2611-032Detergent powder 1 kg96.8%৳88.30
HC-2611-035Floor cleaner 1 L97.5%৳63.10
HC-2611-038Toilet cleaner 750 ml95.9%৳57.40

Fictional batches and costs, for illustration only.

Good to know

Questions teams ask

Other FMCG categories

Can we work with percentages instead of fixed quantities?

Formulas can be scaled to any batch size, and component quantities follow the percentages.

Do we see actual cost or standard cost?

Both can be compared: the planned cost from the formula and the actual cost recorded on the batch.

Is the formula on this page real?

No. It is a simplified, fictional example.

Let's talk it through

Bring a formula to the demo

We will show how it is planned, produced and costed in AdonERP.