Project Accounting Cost Codes

Cost codes: give every taka a place on the project

A cost code is a label for a kind of work or phase: preliminaries, concrete, equipment. Budgets and costs are tagged to it, so you can see where the money is going, not just how much.

See how codes are built

Now onboarding companies in Dhaka.

AdonERP
Nodi Polymer Industries

PRJ-AUTOMATION · Line Automation Upgrade

rd_capex · cost_plus · —active

OverviewCost CodesBudgetsJob CostChange OrdersWIPProgress BillingScheduleRisks & IssuesDocumentsMilestonesBOQBill AllocationsP&L

Cost codes· 6

+ Add cost code

The job-costing backbone (WBS / phase dimension). Budgets and postings are tagged to a cost code; the cost type (labour / material / equipment / subcontract / other) is set per budget line, so the Job Cost report becomes a cost-code by cost-type matrix.

CodeNameActive
01PreliminariesYes
02Civil worksYes
03Equipment & machineryYes
03-100Conveyor and sorting lineYes
04Electrical & controlsYes
05CommissioningYes

New cost code

Code (e.g. 03-300, CSI-style)

Name (e.g. Cast-in-place Concrete)

Parent cost code (optional)

—▾

Sort order

0

Active

Active▾

Notes

CancelSave
A partial preview of Cost Codes in Adon ERP Project Accounting. Company, project and codes are sample data.

How a cost code structure works

Start with a few top-level codes, then nest detail under them. The shape is yours to choose.

  1. 1
    Top level

    Phases or trades

    Add a top-level code for each phase, such as 01 Preliminaries or 03 Concrete.

  2. 2
    Nested

    Detail under each

    Nest finer codes under a parent, such as 03-100 Foundations under 03 Concrete.

  3. 3
    Tagged

    Used everywhere

    Budget lines and bills are tagged to a code, so the reports follow the same structure.

What you fill in on a new cost code

Code
Your own numbering, such as 03-300 or a CSI-style code.
Name
What the code is for, such as Cast-in-place Concrete.
Parent cost code
Optional. Pick a parent to nest this code under it.
Sort order and active
Where it sits in the list, and whether it is still in use.
Notes
Anything the team should know about the code.

Cost codes link planning to spending

They are set up once for a project, then used by the budget, the bills and the reports.

Before the codes

  • Projects

    The project the codes belong to.

Where codes are used

Where it shows up

  • P&L

    Cost grouped the same way.

  • WIP

    Cost to date for the percent complete.

Cost codes for how projects are actually run

Site managers think in phases and trades, accountants think in accounts. A cost code is the bridge between the two.

  • Your own numbering

    Use the codes your engineers already use.

  • Parent and child

    Roll small codes up into phases for a clean summary.

  • Switch off, do not delete

    An unused code can be made inactive, and history stays.

  • One structure per project

    Each project has its own codes, so different jobs can be split differently.

One code, from set-up to report

A sample code for equipment, the way it usually runs.

  1. 03 Equipment & machinery is added as a top-level code.

  2. 03-100 Conveyor and sorting line is nested under it.

  3. A budget line is tagged to the code.

  4. A purchase order is assigned to it.

  5. Job Cost shows its budget, committed and actual.

How different trades use cost codes

Questions we get about cost codes

What is a cost code?

A label for a kind of cost on a project, used to group budgets and spending.

Can codes be nested?

Yes. Pick a parent when you add a code.

What do I need to fill in?

A code and a name. Parent, sort order, active and notes are optional.

Where is the cost type set?

On each budget line, so the report can show code by cost type.

Can I stop using a code?

Yes. Set it to inactive, and past entries stay.

Where is Adon ERP available?

We are currently onboarding companies in Dhaka. Book a demo and we will walk through a sample project with you.

Bring a project’s cost breakdown. We will turn it into cost codes in the demo.

A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.

Explore Project Accounting